Project Sheet
STATE ROAD NETWORK IN WESTERN ANDALUSIA
Health & Safety, OHS · DIRECTORATE GENERAL OF ROADS. MINISTRY OF TRANSPORT AND SUSTAINABLE MOBILITY
| Field | Value |
|---|---|
| Client | DIRECTORATE GENERAL OF ROADS. MINISTRY OF TRANSPORT AND SUSTAINABLE MOBILITY |
| Expediente | SS-SE-004 |
| Title | ADVISORY AND COORDINATION IN HEALTH AND SAFETY FOR CONSTRUCTION WORKS IN THE STATE ROAD NETWORK IN WESTERN ANDALUSIA |
| Award amount (excluding VAT) | 949,262.86 € |
| Start date | 18/09/2023 |
| Execution period | 36 months, extendable by an additional 24 months |

Main tasks to be carried out
- Coordinate the application of the general principles of prevention and safety:
o When making technical and organisational decisions in order to plan the different tasks or work phases that are to be carried out simultaneously or successively.
o When estimating the required duration for the execution of these different tasks or work phases. - Coordinate the activities on site to ensure that contractors and, where applicable, subcontractors and self-employed workers apply consistently and responsibly the principles of preventive action set out in Article 15 of the Occupational Risk Prevention Law during the execution of the work and, in particular, in the tasks or activities referred to in Article 10 of the Royal Decree.
- Report on the Health and Safety Plan of the work and its modifications, for the purpose of its regulatory approval.
- Organise the coordination of business activities, as provided for in Article 24 of the Occupational Risk Prevention Law.
- Coordinate the actions and functions of controlling the correct application of work methods.
- Adopt necessary measures so that only authorised persons can access the site.
- Preparation of reports relating to the Health and Safety Plan, prepared by the contracting companies, and the corresponding processing for its regulatory approval.
- Regular visits to the works, adopting the necessary measures to ensure compliance with the Safety Plan, or, where applicable, detecting and correcting its breaches.
- Preparation of a quarterly report on the actions carried out on the works, analysing the work units whose impact on safety is most notable.
Works covered by the contract
- 45-SE-4900: REORGANISATION OF THE LA PAÑOLETA INTERCHANGE AND ACCESSES TO CAMAS
- 48-SE-4520A: ACTIONS DUE TO CONTRACT TERMINATION: SE-40 MOTORWAY SOUTHWEST SECTOR. SECTION: DOS HERMANAS (A-4) CORIA DEL RIO (A-8058). SUB-SECTION: A-4 INTERCHANGE (DOS HERMANAS) - SOUTH TUNNELS OF THE GUADALQUIVIR - WEST MOUTH. PROVINCE OF SEVILLE.
- 48-SE-4520B: ACTIONS DUE TO CONTRACT TERMINATION: SE-40 MOTORWAY SOUTHWEST SECTOR. SECTION: DOS HERMANAS (A 4) CORIA DEL RIO (A 8058). SUB-SECTION: EAST MOUTH - NORTH TUNNELS OF THE GUADALQUIVIR - CORIA DEL RÍO (A-8058). PROVINCE OF SEVILLE.
- 48-SE-4531: CONSTRUCTION PROJECT FOR COMPLEMENTARY WORKS: “PEDESTRIAN FOOTBRIDGE AT THE CROSSING POINT BETWEEN A-8051 AND SE-40 AND PROTECTION AGAINST EXTERNAL CORROSION OF THE EXISTING SLEEVE AT P.K. 0+440 BY THE IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM.
- 48-SE-4550.ACT: SE-40 MOTORWAY. SECTION: A-49 INTERCHANGE (HUELVA)-SE-510 INTERCHANGE (VALENCINA).
- 48-SE-4560.ACT: SE-40 MOTORWAY. SECTION: SE-510 INTERCHANGE (VALENCINA)-A-66 INTERCHANGE (SILVER ROUTE MOTORWAY). PROVINCE OF SEVILLE.
- 17-H-5020: SERVICE ROAD. ACCESS TO THE CHARE OF THE WESTERN COAST OF HUELVA. A-49 PROVINCE OF HUELVA.
- 25-SE-5100: REMODELLING OF THE A-4/ SE-20 INTERCHANGE.
- 14-SE-5090: REPLACEMENT OF STAY CABLES OF THE CENTENARIO BRIDGE LOCATED BETWEEN P.K. 10+000 AND P.K. 12+000 OF THE SE-30 MOTORWAY IN SEVILLE.
- 41-CA-4200.A: DUPLICATION OF THE N-350 ROAD. SOUTH ACCESS TO THE BAY OF ALGECIRAS PORT. N-350, N-340 AND A-7 ROADS, PROVINCE OF CÁDIZ.
- 49-CO-5610: SOUTHERN MOTORWAY, P.K.404. IMPROVEMENT OF THE CAPACITY OF THE CONNECTION BRANCH OF THE COLLECTOR ROAD - INPUT DATA FOR THE DISTRIBUTOR ON THE RIGHT BANK OF THE WESTERN BYPASS OF CÓRDOBA.
- 29-H-3931: CONDITIONING OF THE "LOS MOLINOS" GREENWAY. OO.CC. BEAS AND TRIGUEROS BYPASS ON THE N-435 ROAD, PROVINCE OF HUELVA.
- 14-H-3990: V CENTENARY MOTORWAY A-49. THIRD LANE ON THE SECTION BETWEEN P.K. 74,250 AND 77,650 AND REMODELLING OF THE SAN JUAN DEL PUERTO INTERCHANGE.
- 29-CA-4140: IMPROVEMENT OF ROAD SAFETY. CONDITIONING OF THE TRES CAMINOS INTERCHANGE. A-4, A-48 AND CA-33 ROADS.